New concept or expansion
Select a coherent structural system, size the elements and define interfaces before decisions become expensive.
Structures · Construction · Field support
Steel, aluminum, concrete and timber — permanent or temporary structures, foundations, platforms, lifting, access and field conditions.
The required outcome: capacity, serviceability, a modification detail or a temporary sequence to establish.
The required outcome may be a capacity, serviceability criterion, modification detail or temporary sequence. Checks begin with equilibrium, mechanics of materials and code requirements; FEA is used only when conventional models are no longer sufficient.

When to involve us
A structural assignment adds value when it clarifies the load path, reduces construction risk or turns a real constraint into a buildable detail.
Select a coherent structural system, size the elements and define interfaces before decisions become expensive.
Assess current conditions, new loads, openings and strengthening without overlooking members already carrying load.
Resolve a nonconformance, tolerance, conflict or changed sequence without improvising the structural behaviour.
Check transient states, temporary supports, lifting points and stability before the final structure is complete.
Design platforms, stairs, walkways, guardrails, lifelines and anchors around the actual use conditions.
Carry equipment reactions through base plates, anchors, foundations and the supporting soil or structure.
Load path
Member strength is not enough if the load cannot pass through connections, bracing and supports into a real foundation.
Dead, live, wind, snow, lifting, impact, vibration, temperature and temporary conditions.
Stiffness, span, local stability, deflection and redistribution of force.
Bracing, diaphragms, torsion, imperfections and construction sequence.
Bolts, welds, plates, bearing, tolerances, gaps and force transfer.
Reactions, anchors, concrete, soil, existing structure and deformation compatibility.

Field reality
Surveys, tolerances, interfaces, erection stages and work methods are part of the structural problem. They must be included before the detail is fixed.
Structural capabilities
The scope is matched to the work: focused check, complete design, independent review, existing-structure modification or field support during construction.
Frames, platforms, walkways, stairs, supports and welded or bolted connections.
Footings, slabs, pedestals, walls, anchors, base plates and reaction transfer.
Members and connections where several materials or special conditions interact.
Earth pressure, drainage, sliding, overturning, bearing and construction details.
Shoring, temporary supports, formwork, erection stages and stability before the final condition.
Lifting points, spreader beams, frames, transient states and operation load paths.
Fall-protection anchors, guardrails, platforms and actual operating conditions.
Surveys, change of use, strengthening, repair, openings, added loads and observed conditions.
Typical applications
The common thread is always the same: understand the use, establish the load path and produce a solution that can be built in the real context.
Approach
Design, analysis, interfaces and constructability are treated as one chain of decisions.
Function, environment, schedule, existing condition, work sequence and access constraints.
Codes, project requirements, combinations, temporary states and serviceability criteria.
Layout, stability, materials, supports and interfaces matched to the real need.
Global and local checks, deflection, stability, connections and foundations.
Connections, tolerances, access, sequence, fabrication, erection and existing-condition coordination.
Drawings, notes, calculations, technical responses and field-condition review when required.
Deliverables
The documentation level is matched to the assignment, while the conclusion, assumptions and critical interfaces remain traceable.
Criteria, loads, assumptions, models, checks and reactions needed by related disciplines.
Dimensions, members, connections, anchors and fabrication or construction notes when required.
A clear answer, modification options, sequence or temporary measures, with an engineering report as appropriate.
Frequently asked questions
An initial review usually confirms whether the need is a focused check, a complete design or field support.
Yes. The scope then begins by identifying the surveys, openings, tests or assumptions needed to avoid artificial precision.
Yes, when the assignment is clearly defined: transient states, supports, lifting points, stability, sequence and interfaces with the final work.
No. Classical methods are often sufficient. FEA is used when geometry, connections or local behaviour require more detailed representation.
Yes, depending on the available information and urgency. Photos, dimensions, drawings, loads and a clear description help define the response.
Related expertise
FEA and seismic qualification extend the work when local behaviour, dynamics or anchorage govern the decision.
Start simply
Send the drawings, surveys, photos, loads and known constraints. An initial review will define the level of engineering that actually adds value.